ConnectApi.ChangeOrderItemSummaryInputRepresentation

A change to an order item summary.

PropertyTypeDescriptionRequired or OptionalAvailable Version
changeTypeStringWhether a new order item summary is being created or an existing summary is being updated. Valid values are New or Update.Required66.0
orderItemSummarySObjectThe order item summary sObject representation that contains the changes for the Order Item Summary entity.Required66.0
referenceIdStringThe unique reference ID for this order item summary. This field is valid only if the Change Type value is New.Optional66.0