ConnectApi.PreviewCartToExchangeOrderInputRepresentation
Information required to preview a cart to exchange order.
| Property | Type | Description | Required or Optional | Available Version |
|---|---|---|---|---|
exchangeCartId | String | ID of the cart used for adding items to the exchange order. | Required | 60.0 |
orderSummaryId | String | Order summary ID. | Required | 60.0 |
referenceId | String | Return order ID. | Required | 60.0 |
reservationType | String | The type of the reservation. | Optional | 61.0 |